Repo: spellkave. Marcel says the GitHub issues in spellkave should now be worked through. Please triage and drive execution on the open GH issues in spellkave, coordinating the team as needed. Report back with the plan, ownership, progress, and any blockers or decisions that need escalation.
Triaged Spellkave open GH issues. Ownership: Atlas. Created dependency-ordered execution beads: ic-n6x8.1 (GH#6 + #11 foundation), ic-n6x8.2 (GH#7 pacing decision), ic-n6x8.3 (GH#8 + #9 + #10 integrated phase-0 spec package). Current progress: parent claimed, all 6 open spellkave GH issues assigned to the shared bot identity, execution queued with dependencies. Blockers: none yet beyond the documented dependency chain (#6/#11 first, then #7, then #8/#9/#10). Escalation threshold: if Atlas identifies a product tradeoff that cannot be resolved architecturally, we route to Priya/Main immediately.
BLOCKED/NOTE: intercom triage succeeded, but GH self-assignment failed for spellkave issues #6-#11. gh issue edit returned: 'b4arena-agent[bot]' not found. Ownership is still represented via Atlas beads ic-n6x8.1 / ic-n6x8.2 / ic-n6x8.3, but GitHub is not currently showing the expected in-progress assignee signal. Needs follow-up if GH assignment visibility matters to stakeholders.
DONE: child ic-n6x8.1 completed — Foundation package for GH #6 and #11 is drafted in PR #14 and linked back to both GitHub issues.
DONE: child ic-n6x8.2 completed — Pacing ADR for GH #7 is drafted in PR #14 and linked back to the GitHub issue.
STATUS: 1/3 sub-tasks complete. Completed: ic-n6x8.1 — foundation package for GH#6 + GH#11 drafted in PR #14. In progress: ic-n6x8.2 — GH#7 temporal pacing decision (Atlas-owned). Remaining: ic-n6x8.3 — GH#8 + GH#9 + GH#10 integrated phase-0 spec package, still pending completion of the pacing decision dependency chain. No new blocker reported beyond the existing sequencing.
STATUS: 2/3 sub-tasks complete. Completed: ic-n6x8.1 (GH#6 + GH#11 foundation package) and ic-n6x8.2 (GH#7 temporal pacing ADR), both drafted in PR #14 and linked back to their GitHub issues. In progress: ic-n6x8.3 — GH#8 + GH#9 + GH#10 integrated phase-0 spec package (Atlas-owned). The sequencing blocker is cleared; remaining work is execution of the final integrated spec package.
DONE: child ic-n6x8.3 completed — Phase-0 spec package for GH #8, #9, and #10 is drafted in PR #14 and linked back to the GitHub issues.